Project : Waste Line 2 O&M Service (JV LDS-NDP)

Waste Line 2 Operation and Maintenance Service

  • Customer : Hongsa Power Company Limited
  • Contract Period : 4.5 years (started mid of 2015)
  • Production : 34 million BCM per year
  • Currently Consists of :
    • 5 MMD crushers
    • 1 SMC fixed conveyor, 10,500TPH at BW1,800mm, 5.2m/s
    • 5 SMC fixed conveyor, 18,000TPH at BW2,400mm, 5.2m/s
    • 1 SMC shiftable conveyor (tripper car), 18,000TPH at BW2,400mm, 5.2m/s
    • 1 SMC spreader, 18,000TPH at BW2,600mm, 5.2m/s
  • Activities :
    • Operation and maintenance
    • Additional works e.g. line shifting, relocation, new installation, etc.

Gallery